TorontoGPUCanada Join waitlist

Canadian owned. Toronto operated.

Blackwell.
On your terms.

96 GB per GPU. Dedicated to your workload.
Our Toronto fleet is fully rented. Join the waitlist for the next opening.

Fully rented · Waitlist openMONTHLY · CAD
OUR CANADIAN FLEET
12 GPUs / 2 rigs
CURRENT AVAILABILITY
Fully rented / 0 GPUs free
FUTURE AVAILABILITY
Waitlist open / enquire below
ACCESS & BILLING
Direct SSH / monthly, CAD

01 Built for your workload

TORONTO, ONTARIO / CANADA

Plan your
next workload.

Both rigs are fully rented. Tell us how much capacity you need and when. Join the waitlist to hear about a suitable opening.

4-GPU RIGFully rented
8-GPU BLACKWELL RIGFully rented

YOUR FUTURE GPU REQUIREMENT

Number of GPUs for your waitlist request
768
GBTOTAL VRAM

96 GB GDDR7 per GPU. Aggregate capacity,
not a unified memory pool.

Join waitlist for 8 GPUs

No capacity available now. A waitlist request is not a reservation.

8-GPU BLACKWELL RIG8 × 96 GB
BLACKWELL ARCHITECTUREREQUIREMENTS PLANNER · FULLY RENTED
ACCESS
Bare metal or containers
MEMORY
96 GB GDDR7 per GPU
RESERVATION
Dedicated monthly capacity
OWNERSHIP
100% Canadian owned

02 Two ways to make it yours

HOSTED IN TORONTO / INSTALLED AT YOUR SITE

Power, wherever
you need it.

A / HOSTED GPU WAITLIST↗

Your own capacity.
In Toronto.

All hosted capacity is currently rented.
Join the waitlist for dedicated GPUs in Toronto.

You bring
Your workload & requirements
We handle
The hardware & physical setup
You get
Dedicated GPUs, direct SSH
Join the hosted waitlist
B / ON-SITE INFRASTRUCTURE↙

Your own hardware.
On your site.

Your building. Your network. Your hardware.
We spec, source, test and install the node.

You bring
Your site & operating requirements
We handle
Hardware, integration & facility planning
You get
A node you own, on your network
Plan your build
BEYOND THE BOX

Rack, UPS, cooling and network planning. Electrical work with a licensed contractor. Just need hardware sourcing? We do that too.

03 Independently owned. Personally operated.

DIRECT CONTACT / BUSINESS-HOURS SUPPORT
CANADIAN OWNED.LOCALLY OPERATED.
Toronto.↗
43°39′ N / 79°23′ WCITY STUDY / NOT A SITE MAP

Close to the hardware.
Closer to you.

Ali Hamadi · Owner & operator

I run both TorontoGPU rigs. Contact me for capacity, hardware questions and support. For larger requirements, we can scope a separate build and quote.

AHOWNER & OPERATOR
TORONTO, ONTARIO
+1 437 332 9890 PHONE & EMAIL / TORONTO BUSINESS HOURS
SERVICE SCOPE

Two rigs at one Toronto site. Business-hours support. No multi-region failover or 99.99% SLA. We’ll confirm whether the setup meets your requirements before you reserve.

BEFORE YOU CONNECT

A few things
worth knowing.

01How does the waitlist work?

Send your GPU requirements, workload and preferred timing by email. We’ll confirm your request and contact you when suitable capacity opens up. Joining is free and does not reserve capacity or guarantee a start date.

02What does it cost?

We quote in CAD based on the capacity, term and setup. Share your GPU or VRAM needs and target start date. Price, taxes, access and cancellation terms are provided in writing before payment.

03Can our data stay in Canada?

Our hosted hardware is in Toronto. Share your storage, access and data-flow requirements so we can confirm the arrangement in writing. If data must remain inside your facility, ask about an on-site build.

04What about compliance?

We do not currently offer compliance certifications. We can provide ownership and location facts, including the site address under NDA. Your security and legal teams determine whether the setup meets your requirements.

05Can you just source the hardware?

Yes. Send your specification for a hardware quote. Installation is optional. We can also help plan the rack, power, UPS, cooling and networking.

04 / WAITLIST & ENQUIRIES

Join the
waitlist.↗

Hosted capacity is fully rented. Send your requirements to join the waitlist.
On-site builds and hardware enquiries are still welcome.

PLAN YOUR NEXT STEPNO COMMITMENT
YOUR REQUESTED CAPACITY8 GPUs / 768 GB total VRAMChange ↗

Send the email to request a place on the waitlist. No payment or guaranteed start date.